
Your driveway cracks every winter. Road salt does its damage. By spring, the surface looks rough and tired. You don't need to tear it out to fix it.
What We Offer
At Van Drunen Outdoor Living, we resurface driveways with Rubber Stone and Vuba Stone. Both go directly over existing concrete or asphalt, with no demolition needed.
Zachary Van Drunen, Antonio Baez, and Erik Weathersby run every job. Most driveways finish in one to two days, ready for foot traffic in 24 hours. We back the work with a 5-Year Product warranty and 1-Year Craftsmanship. See our gallery or contact us to get a free estimate.






Driveway Resurfacing Features
- Surface cleaning and preparation
- Crack and damage repair before coating
- Product and color selection consultation
- Rubber Stone or Vuba Stone application
- Slip-resistant texture built into surface
- UV-stable coating that holds color
- Permeable drainage options available
- Final walkthrough and care instructions
Benefits
- Withstands road salt and freeze-thaw cycling
- Ready for foot traffic in 24 hours
- Covers and seals existing cracks and surface damage
- 20-plus color options to choose from
- No demolition or concrete disposal cost
- Lasts 15-25 years with proper care
- Adds grip and slip resistance to the driveway surface
- Costs less than full concrete replacement
The Driveway Resurfacing Process
- Free Estimate
We visit your property to look at the driveway, assess the surface condition, and talk through your options. You get a clear estimate with no obligation.
- Surface Preparation
We clean the surface thoroughly, repair cracks and damaged areas, and make sure the driveway is ready to accept the new coating properly.
- Color Selection
You choose your color blend from Rubber Stone or Vuba Stone options. We can show you samples and walk you through what works best for your home.
- Product Application
We apply your chosen product in even layers, building to the specified thickness for durability and proper adhesion.
- Final Walkthrough
We inspect the finished surface with you, confirm it meets your expectations, and go over care and maintenance tips before we leave.
Cost & Timeline
Estimated Cost
Driveway resurfacing with Rubber Stone or Vuba Stone typically costs $10 to $18 per square foot. The final price depends on driveway size, the current surface condition, the product chosen, and the color blend selected.
Estimated Timeline
Most driveway resurfacing projects take one to two days. The surface is ready for foot traffic within 24 hours and for vehicle traffic within 48 to 72 hours.
Frequently Asked Questions
No. Both Rubber Stone and Vuba Stone apply directly over existing concrete or asphalt, so there is no demolition and no concrete disposal. This is one of the main reasons resurfacing costs significantly less than full replacement.
With proper installation and standard care, both products are designed to last 15-25 years. They are UV-stable, rated for freeze-thaw conditions, and resistant to road salt, which are the main factors that degrade driveways in Northwest Indiana and Chicagoland.
Yes. Rubber Stone comes in 20-plus colors and blends, and Vuba Stone has an equally wide selection of natural-look color options. We walk you through the options at the estimate and can show you samples on-site.
The surface is ready for foot traffic within 24 hours. Most driveways are ready for vehicle traffic within 48 to 72 hours, depending on weather and product. We let you know the exact timeline before we start.
Yes. We back every driveway resurfacing project with a 5-Year Product warranty and a 1-Year Craftsmanship warranty. If something goes wrong within the warranty period, we come back and make it right.





